MEMBER SIGN IN
Not a member? Become one today!
         iBerkshires     Southern Berkshire Chamber     Lee Chamber     Lenox Chamber     Berkshire Community College    
Search
Construction Begins in Castle Hill Neighborhood In Great Barrington
12:10PM / Thursday, June 30, 2022
Print | Email  

GREAT BARRINGTON, Mass. — Beginning July 5, 2022 contractors for the Town of Great Barrington will be working in the Castle Hill neighborhood, conducting investigative drilling on various streets.
 
Work will take place from 8 a.m. until 4 p.m., for about 10 days. Contractors will be using a drilling rig to bore holes through the pavement and sub-base of the road, at various locations. 
 
This work is a preliminary step in planning for future replacement of much of the sewer and drainage infrastructure in this neighborhood.
 
Work will occur on Castle Street, Castle Hill Avenue, Hollenbeck Avenue, Prospect Avenue, Sumner Street, and Taconic Avenue. Minor detours may be needed but major road closures are not expected, and the public is advised to use caution when near the work sites.
0Comments
More Featured Stories
SouthBerkshires.com is owned and operated by: Boxcar Media 102 Main Sreet, North Adams, MA 01247 -- T. 413-663-3384
© 2024 Boxcar Media LLC - All rights reserved